International Project


Release time:

2024-12-06

  • Algeria 233 Photovoltaic Power Station Project
  • Mongolia Ali A-Given 110KV Smart Substation Project
  • China Electric Power Construction Investment and Construction of the First Energy Project of the China-Pakistan Economic Corridor
  • LBDC-06B Canal Project in Punjab Province, Pakistan
  • China Metallurgical Group Overseas Malaysia Johor Bahru Project
  • Vietnam Anhua Project
  • Philippines 20MW Photovoltaic Power Generation Project
  • Thailand Waste Heat Power Plant Project
  • Vietnam NHO QUE 2 Hydropower Station Project
  • Vietnam Quang Ninh Power Plant Project
  • Indonesia Maluku Province Obi
  • Pakistan DAWOOD Wind Farm Project 132KV Booster Station
  • Egypt 22KV Substation
  • Africa Ghana Gas Cycle Power Generation Project
  • Sudan Khartoum North Power Plant Project
  • India Jiajia Power Plant Project
  • Turkey Cement Waste Heat Power Generation Project
  • Belarus Minsk North 330KV Substation

Keyword:

Recent information


The main factors of insufficient selection principle for small current grounding.

The automatic line selection technology for small current grounding is a challenging problem. Its difficulty mainly lies in the fact that during a single-phase grounding fault, the fault signal is small, unlike other fault types such as two-phase short circuit or two-phase grounding short circuit, which have much larger fault signals. The types of single-phase grounding faults are complex and uncertain, including full grounding faults, intermittent arc grounding, grounding with unstable resistance, and grounding through branches (high-resistance grounding), among others.